UMC HVAC Project
Ìý
Timeline
Construction at UMC will occur from January to July 2026.
Ìý
Preparations and communication will start in September 2025.
Construction workÌýÌý
Upcoming construction will improve the HVAC system, Campus Dining Services loading dock and pavement between the UMC and CASE buildings. This includes:Ìý
- Replacing outdated HVAC equipment in UMC dining areas.
- Connecting new units to the campus chilled water system.
- Removing a non-functioning cooling tower.
- Expanding the dock for improved efficiency, safety and traffic flow.Ìý
Enhancements also include:Ìý
- Installing an infrared snow-melt system for improved safety at the Book Store dock ramp.
- Replacing an aging kitchen utility distribution panel to prevent costly emergency repairs.
- Converting the west dining area to energy-efficient LED lighting.ÌýÌý
Ìý
Amenities during constructionÌý
The following locations will be open during construction:Ìý
Student services and spaces:
- Alienware Buffalo Esports and Gaming Lounge
- Basic Needs Center
- Buff Pantry
- Center for Student Involvement
- Commuter Lounge
- Âé¶¹Ãâ·Ñ°æÏÂÔØBook Store
- Âé¶¹Ãâ·Ñ°æÏÂÔØCollegiate Recovery Community
- Âé¶¹Ãâ·Ñ°æÏÂÔØEvents Planning & Catering
- Âé¶¹Ãâ·Ñ°æÏÂÔØNightRide
- Âé¶¹Ãâ·Ñ°æÏÂÔØStudent Government
- Dennis Small Cultural Center
- Elevations Credit Union
- Environmental Center
- Fraternity and Sorority Life
- Glenn Miller Ballroom
- Ink Spot
- Off-Campus Life
- Peace Corps
- Program Council
- Reflection Room
- SECA Lounge
- Service Learning & Impact in Community Engagement
- Student Legal Services
- The Connection (food will be available)
- Standard reservable event spaces (Glenn Miller Ballroom, Aspen Rooms, 235 multipurpose room, etc.)
- Meeting and study spaces around the UMCÌý
Dining:
- UMC first floor
- The Connection: hot food and snacks
- UMC Market: sandwiches, salads, sushi, snacks, drinksÌýand more
- Illy: coffee vending machine
- UClub across the street
- Roaming Ralphie food trailer
The following locations will be closed during construction (January-July 2026):
Dining:Ìý
- Alferd Packer Grill
- Infinitus Pie
- Panda Express
- Subway
- Starbucks
Spaces:
- First floor dining rooms and North Dining Stage
Directional signage and navigationÌýÌý
- There will be on-site signage for clearly marked pathways and safety zones.
- The digital campus map is available also.
- We will continuously assess and improve signage to enhance navigation.Ìý
How to stay informedÌýÌý
- This webpage will be updated weekly with progress, milestones and impact notices.
- Regular construction updates will be shared in the Âé¶¹Ãâ·Ñ°æÏÂÔØBoulder Today newsletter.
- Follow us on and for real-time updates.
- Real-time emergency notifications and alerts will be shared if there are any sudden changes or safety concerns.Ìý
Contact usÌý
For inquiries or concerns, please reach out via:Ìý
Ìý
Email
umc-admin@colorado.edu
Ìý
Phone
303-492-8832
Ìý
Office hours
Visit UMC 305, Monday – Friday from 8 a.m. to 4:30 p.m.ÌýÌý
Thank you for your patience and cooperation as we work to create a new and improved University Memorial Center for our campus community!Ìý